Bose-Mall of Egypt-audio

2025 – 2026

Executed comprehensive refurbishment and renovation works for the retail store, including dismantling, restoration, maintenance, replacement of damaged components, reinstallation, and final handover.
The scope of work included:
Flooring Refurbishment Works, including the careful dismantling of existing parquet flooring, restoration and reinstallation of reusable materials, replacement of damaged sections, and finishing works to restore the original appearance and performance.
Painting and Finishing Works, including surface preparation, repair of defective areas, and complete repainting of the store.
Electrical Systems Rehabilitation, including the dismantling, maintenance, testing, replacement of defective components, and reinstallation of lighting, power, data, and fire alarm systems.
HVAC Maintenance Works, including servicing of air conditioning units, cleaning of ductwork and air distribution networks, and testing to ensure optimum system performance.
Joinery and Wooden Furniture Refurbishment, including repair, maintenance, refinishing, and repainting of all existing wooden fixtures and built-in furniture.
Storefront Upgrade Works, including the supply and installation of a new external shop signage in accordance with the approved design requirements.
All works were executed while maintaining business continuity requirements, ensuring the restoration of the store’s functionality, aesthetics, and operational performance in accordance with the client’s standards and project specifications.

Read more

Aubaine_Arkan Mall

2023-2024

Executed the complete Mechanical, Electrical, and Plumbing (MEP) works for the restaurant, covering all phases from initial installation and system integration through testing, commissioning, handover, and successful operation.
The scope of work included:
Plumbing Systems, including domestic water supply networks, kitchen drainage networks, grease interceptors, and stainless-steel drainage Trench Drain.
HVAC Systems, comprising Fan Coil Units, chilled water distribution piping, fresh air systems, exhaust ventilation systems, galvanized steel ductwork, black steel ductwork, and the supply and installation of ventilation and exhaust fans.
Firefighting Systems, including seamless steel piping networks, firefighting equipment, and all associated accessories.
Electrical Systems, including power distribution, lighting installations, socket outlets, and complete electrical infrastructure.
Low Current Systems, including structured cabling, data networks, telephone systems, and associated communication infrastructure.
Addressable Fire Alarm System, including detection, control, and notification devices.
Specialized Fire Suppression Systems, including Wet Chemical Fire Suppression Systems for kitchen hoods and automatic fire suppression systems for electrical panels.
All works were executed in accordance with approved shop drawings, project specifications, and relevant international standards, followed by comprehensive testing and commissioning to ensure full operational readiness prior to handover.

Read more

Heka Pharmacy_Palm Hills

2022-2023

Executed the complete Mechanical, Electrical, and Plumbing (MEP) works for the Pharmacy, covering all phases from initial installation and system integration through testing, commissioning, handover, and successful operation.
The scope of work included:
Plumbing Systems, including domestic water supply and drianage networks.
HVAC Systems, comprising Fan Coil Units, chilled water distribution piping, fresh air systems, exhaust ventilation systems, galvanized steel ductwork.
Firefighting Systems, including seamless steel piping networks, firefighting equipment, and all associated accessories.
Electrical Systems, including power distribution, lighting installations, socket outlets, and complete electrical infrastructure.
Low Current Systems, including structured cabling, data networks, telephone systems, and associated communication infrastructure.
Conventional Fire Alarm System, including detection, control, and notification devices.
Electrical Distribution Systems, including main and sub-main electrical panels, energy metering systems, power distribution networks, and all associated electrical components.
All works were executed in accordance with approved shop drawings, project specifications, and relevant international standards, followed by comprehensive testing and commissioning to ensure full operational readiness prior to handover.

Read more

MindHaus_District five

2022-2023

Executed the complete Mechanical, Electrical, and Plumbing (MEP) works for five administrative buildings, covering both infrastructure and internal building services, including the supply, installation, testing, and commissioning of all systems.
The scope of work included:
Infrastructure Works, comprising electrical infrastructure networks, foul and storm drainage systems, and HDPE piping networks for firefighting risers.
Firefighting Systems, including internal firefighting networks utilizing ERW steel piping, Zone Control Valve assemblies, and all associated valves, fittings, and accessories.
Plumbing Systems, including domestic water supply networks, sanitary drainage systems serving restrooms, and HVAC condensate drainage systems.
HVAC Systems, comprising DX Concealed Air Conditioning Units, refrigerant copper piping networks, control cabling, and all associated HVAC accessories.
Ventilation Systems, including the supply and installation of mechanical ventilation and exhaust fans.
Electrical Systems, including main power distribution networks, cable trays and containment systems, lighting installations, power outlets, and associated electrical infrastructure.
Low Current Systems, including structured cabling and data networks.
Addressable Fire Alarm System, including detection, notification, and control equipment integrated in accordance with project requirements.
Electrical Distribution Systems, including main and sub-main electrical panels, energy metering systems, power distribution networks, and all associated electrical components.
Electrical Panel Fire Suppression Systems, providing automatic fire protection for electrical distribution boards and critical electrical equipment.
FM-200 Clean Agent Fire Suppression Systems for archive rooms and data rooms, including detection, control, discharge, and monitoring systems to ensure the protection of sensitive equipment and critical records without causing damage to electronic assets.
All works were executed in compliance with approved shop drawings, technical specifications, and applicable international standards, followed by testing and commissioning to ensure full operational performance and successful project handover.

Read more

Regheef Ouf Restaurant – Waslet Dahshour

2024 – 2025

Location

Waslet Dahshour

Scope of work

Fully Furnished

Description

Regheef Ouf is one of the most popular restaurant chains in Egypt, with numerous branches and a large, loyal customer base. We proudly delivered their new branch in a record time of 45 days, allowing the restaurant to open just in time for Ramadan.

Our team managed the full scope of work, from MEP (Mechanical, Electrical, and Plumbing) installations to the turnkey delivery of a fully furnished and operational restaurant. Every detail was carefully executed to ensure the project was not only delivered on schedule, but also met the highest standards of quality and craftsmanship.

Read more

Elle Saloon

2024

Elle Saloon

Location

Golf Central Mall

Scope of work

Fully Furnished

Description

Elle Salon is one of the most iconic beauty destinations in Egypt, where elegance and expertise come together.

We had the honor of bringing their new branch to life, managing every aspect of the project, from MEP (Mechanical, Electrical, and Plumbing) works to complete furnishing.

In close collaboration with the JLL team, we created a space that reflects Elle Salon’s refined identity, delivered on time and with uncompromising quality.

Read more

Richie Furniture

2023 – 2024

Location

Mivida

Scope of work

Fully Furnished

Description

We proudly executed this project from start to finish, providing a seamless, fully integrated solution. We expertly designed and implemented the MEP systems, optimizing ceiling height by maintaining technical precision.

Our team effectively tackled the challenges posed by beams, ensuring a flawless design that maximized functionality and aesthetics. The final result exemplifies our commitment to high-quality craftsmanship and attention to detail.

Read more

Mon Maki Restaurant

2023 – 2024

Scope of work

Fully Furnished

Location

Golf Central Mall

Description

We are proud to have completed the finishing and execution works for the MON MAKI restaurant. We successfully overcame all the challenges encountered during the project, delivering a seamless and high-quality design.

From resolving technical issues to executing every detail with precision, our team delivered a fully furnished branch, ready for operation.

The result reflects the highest quality standards and a design that truly embodies the unique identity of the restaurant.

Read more

Brunch & Cake

2022 – 2023

Location

Golf Central Mall

Scope of work

MEP

Description

Brunch & Cake is an award-winning restaurant, known for its iconic locations, beautiful interiors, and wholesome dishes.

Atlantide proudly executed the MEP works for their branch, managing electrical, HVAC, water supply, and drainage systems with precision.

We addressed technical challenges and ensured seamless integration, delivering the project in close collaboration with the JLL team, and we are proud to have contributed to the success of their vision.

Read more

Jouri Restaurant

2022 – 2023

Location

Golf Central Mall

Scope of work

MEP

Description

Atlantide is honored to support Chef Al Khaldi’s vision by launching the first branch of Jouri in Egypt.

In collaboration with the JLL team, we carried out everything from MEP systems to fully finished luxury furnishings, delivering unmatched precision and elegance.

.

Read more